Assembily
New assembly work order and follow-up process.
New assembly work order and follow-up process.
Asansis allows you to manage your elevator installation processes end-to-end on a construction site basis, from pre-installation to the completion of official procedures.Field data is processed in real time; All stages, from subcontractor entitlement to inspection and municipal files, are tracked on a single system.
| Site Based Work
Elevator installation works are separated and managed on a construction site basis.Information about each construction site, subcontractor selections, contract terms and progress payment rates are recorded. |
Subcontracting Agreement and Progress Tracking
Site-based subcontracting agreementis created and detailed percentage progress is tracked throughout the construction site. |
|
Stock Integration
Sending and returning products with stock links from within the siteis executed; Reports of the materials shipped to the construction site are received. |
Comprehensive Data Entry
Data is entered for all operations before and after assembly.General, title deed, technical and official information of the elevator is processed completely. |
|
Component Management
The components used in the elevator are selected from the component warehouse and serialIt is made ready for number entry. |
Field Based Update
Data can be entered and updated from the field at every stage of the assembly; staff via mobile application,Adds data easily. |
|
Stage and Progress Tracking
By entering 22 stages as a percentage in the control menu, stage tracking is done and subcontractor progress payment is calculated.Disputes are prevented by recording explanation notes for progress payments given below 100%. |
Concurrent Data Completion
Similar to the end of data entryTimely completion is ensured; Thus, elevator information is accessed without interruption when official procedures begin. |
|
Progress Report
Assembly progress percentages on the elevator pageis displayed in detail. |
Cabinet Order
The cabin order is prepared in detail with visuals. |
|
Inspection Application
The operational burden is reduced by preparing the examination application process in a digital environment. |
EU Declaration of Conformity
Incorrect data is updated immediately during the inspection; a stamped and signed EU Declaration of Conformity can be forwarded to the organization. |
|
60-Day Official Process Tracking
After the inspection, a 60-day official process is followed until the green label is received and the municipality file is delivered.The warranty expiration period is offered after all operations are completed. |
Municipal Files
After inspection, municipal files can be processed individually or in bulk within seconds.It is prepared. |
|
Transfer to Maintenance
Registered elevators are transferred to the maintenance system in one step. |
Auxiliary Tables
Technical auxiliary tables such as ropes, beams, beams, consoles and pulleys are made available. |